
Pass SAP C-TS422-2021 Actual Free Exam Q&As Updated Dump Nov 28, 2023
Latest C-TS422-2021 Actual Free Exam Updated 82 Questions
SAP C_TS422_2021 certification exam is ideal for professionals who want to enhance their knowledge of SAP S/4HANA Production Planning and Manufacturing. C-TS422-2021 exam is designed to test their knowledge of the SAP S/4HANA Production Planning and Manufacturing modules, including demand management, material requirements planning, and production execution.
SAP C-TS422-2021 exam is suitable for professionals who possess industry experience in the field of production planning and manufacturing using SAP. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification is an excellent opportunity for individuals who want to enhance their skills and knowledge in SAP S/4HANA Production Planning and Manufacturing. Moreover, this certification also serves as a benchmark for employers who are looking for SAP professionals with the required expertise.
SAP C-TS422-2021 certification exam is designed for professionals who wish to validate their skills and knowledge in SAP S/4HANA Production Planning and Manufacturing. C-TS422-2021 exam covers various topics such as production orders, material requirements planning, capacity planning, and shop floor control. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is intended for individuals who work in the area of production planning and manufacturing and have a basic understanding of SAP S/4HANA. By passing C-TS422-2021 exam, candidates can demonstrate their proficiency in SAP S/4HANA production planning and manufacturing, which can be a valuable asset for their career growth.
NEW QUESTION # 47
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with an alternative sequence in the routing
- B. A production line with a parallel sequence in the routing
- C. A production line with more than one work center
- D. A production line with prioritized alternative work centers
Answer: C
NEW QUESTION # 48
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the explosion type of the phantom assembly in the BOM.
Answer: D
NEW QUESTION # 49
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The cross-plant status
- B. The last restrictive status
- C. The most restrictive status
- D. The plant-specific status
Answer: C
NEW QUESTION # 50
Where do you maintain the work center that represents the production line for repetitive manufacturing?
- A. Routing
- B. Production cost collector
- C. Production version
- D. Repetitive manufacturing profile
Answer: A,C
NEW QUESTION # 51
What are some uses for the low-level code assigned to each material?
- A. It is used in MRP to determine the sequence in which materials are planned.
- B. It is used by product costing to determine how coast are rolled up.
- C. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
- D. it is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION # 52
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a handling resource in the location master and goods receipt time in the material master.
- B. Model a seperate resource in the production data structure.
- C. Model a resource inbound in the location master.
- D. Model a transportation resorce in the location master.
Answer: A,D
NEW QUESTION # 53
For a production version to be valid and consistent what requirements must be fulfilled?
- A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
- B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- C. The lot size range must be within the lot-size range of the assigned routing.
- D. The assigned routing must NOT have alternative sequences.
- E. The assigned routing must be a rate routing.
Answer: A,B,C
NEW QUESTION # 54
Which item statuses can you select inside a material BOM?
- A. Engineering
- B. Quality management
- C. Service
- D. Sales
Answer: A,D
NEW QUESTION # 55
Which information is required when you created a production master in SAP S/4HANA?
- A. Base unit of measure
- B. Industry sector
- C. Product type
- D. Selective screen for views
Answer: C,D
NEW QUESTION # 56
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?
- A. Total replenishment lead time
- B. In-house production time
- C. Operation duration
- D. Planed delivery time
Answer: B,D
NEW QUESTION # 57
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Capacity Requirements Planning (CRP)
- C. Supply Network Planning (SNP)
- D. Material Requirements Planning (MRP)
Answer: D
NEW QUESTION # 58
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Alphanumeric or quota arrangement
- B. Planned order or material number
- C. Lot size or material cost
- D. Valid period or sale order
Answer: A
NEW QUESTION # 59
How can you achive a feasible production plan in case of capacity constraints?
- A. Reduce the planning window
- B. Execute an infinite production planning run
- C. Select an alternative mode on a resource.
- D. Form optimum sequence to reduce setup times
- E. Adjust the available capacity.
Answer: C,D,E
NEW QUESTION # 60
Which time elements are relevant for lead time scheduling of a production order?
- A. Total replenishment lead time
- B. Float after production
- C. Setup time
- D. Planned delivery time
Answer: B,D
NEW QUESTION # 61
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control
- B. Finiteness level
- C. Planning mode
- D. Fixed pegging
- E. Direction
Answer: A,C,E
NEW QUESTION # 62
......
Online Questions - Valid Practice C-TS422-2021 Exam Dumps Test Questions: https://gocertify.topexamcollection.com/C-TS422-2021-vce-collection.html

