Pass SAP C-TS422-2021 Actual Free Exam Q&As Updated Dump Nov 28, 2023 [Q47-Q62]

Share

Pass SAP C-TS422-2021 Actual Free Exam Q&As Updated Dump Nov 28, 2023

Latest C-TS422-2021 Actual Free Exam Updated 82 Questions


SAP C_TS422_2021 certification exam is ideal for professionals who want to enhance their knowledge of SAP S/4HANA Production Planning and Manufacturing. C-TS422-2021 exam is designed to test their knowledge of the SAP S/4HANA Production Planning and Manufacturing modules, including demand management, material requirements planning, and production execution.


SAP C-TS422-2021 exam is suitable for professionals who possess industry experience in the field of production planning and manufacturing using SAP. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification is an excellent opportunity for individuals who want to enhance their skills and knowledge in SAP S/4HANA Production Planning and Manufacturing. Moreover, this certification also serves as a benchmark for employers who are looking for SAP professionals with the required expertise.


SAP C-TS422-2021 certification exam is designed for professionals who wish to validate their skills and knowledge in SAP S/4HANA Production Planning and Manufacturing. C-TS422-2021 exam covers various topics such as production orders, material requirements planning, capacity planning, and shop floor control. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is intended for individuals who work in the area of production planning and manufacturing and have a basic understanding of SAP S/4HANA. By passing C-TS422-2021 exam, candidates can demonstrate their proficiency in SAP S/4HANA production planning and manufacturing, which can be a valuable asset for their career growth.

 

NEW QUESTION # 47
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with a parallel sequence in the routing
  • C. A production line with more than one work center
  • D. A production line with prioritized alternative work centers

Answer: C


NEW QUESTION # 48
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the phantom item indicator for the phantom assembly in the BOM.
  • C. Change the special procurement key of the phantom assembly in the BOM.
  • D. Change the explosion type of the phantom assembly in the BOM.

Answer: D


NEW QUESTION # 49
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The cross-plant status
  • B. The last restrictive status
  • C. The most restrictive status
  • D. The plant-specific status

Answer: C


NEW QUESTION # 50
Where do you maintain the work center that represents the production line for repetitive manufacturing?

  • A. Routing
  • B. Production cost collector
  • C. Production version
  • D. Repetitive manufacturing profile

Answer: A,C


NEW QUESTION # 51
What are some uses for the low-level code assigned to each material?

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by product costing to determine how coast are rolled up.
  • C. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
  • D. it is used by ATP to determine the priority of alternative components.

Answer: A,B


NEW QUESTION # 52
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a handling resource in the location master and goods receipt time in the material master.
  • B. Model a seperate resource in the production data structure.
  • C. Model a resource inbound in the location master.
  • D. Model a transportation resorce in the location master.

Answer: A,D


NEW QUESTION # 53
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C


NEW QUESTION # 54
Which item statuses can you select inside a material BOM?

  • A. Engineering
  • B. Quality management
  • C. Service
  • D. Sales

Answer: A,D


NEW QUESTION # 55
Which information is required when you created a production master in SAP S/4HANA?

  • A. Base unit of measure
  • B. Industry sector
  • C. Product type
  • D. Selective screen for views

Answer: C,D


NEW QUESTION # 56
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. Total replenishment lead time
  • B. In-house production time
  • C. Operation duration
  • D. Planed delivery time

Answer: B,D


NEW QUESTION # 57
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Demand Planning (DP)
  • B. Capacity Requirements Planning (CRP)
  • C. Supply Network Planning (SNP)
  • D. Material Requirements Planning (MRP)

Answer: D


NEW QUESTION # 58
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Alphanumeric or quota arrangement
  • B. Planned order or material number
  • C. Lot size or material cost
  • D. Valid period or sale order

Answer: A


NEW QUESTION # 59
How can you achive a feasible production plan in case of capacity constraints?

  • A. Reduce the planning window
  • B. Execute an infinite production planning run
  • C. Select an alternative mode on a resource.
  • D. Form optimum sequence to reduce setup times
  • E. Adjust the available capacity.

Answer: C,D,E


NEW QUESTION # 60
Which time elements are relevant for lead time scheduling of a production order?

  • A. Total replenishment lead time
  • B. Float after production
  • C. Setup time
  • D. Planned delivery time

Answer: B,D


NEW QUESTION # 61
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Scheduling control
  • B. Finiteness level
  • C. Planning mode
  • D. Fixed pegging
  • E. Direction

Answer: A,C,E


NEW QUESTION # 62
......

Online Questions - Valid Practice C-TS422-2021 Exam Dumps Test Questions: https://gocertify.topexamcollection.com/C-TS422-2021-vce-collection.html