Latest [Mar 09, 2023] 100% Passing Guarantee - Brilliant C_TS422_2021 Exam Questions PDF [Q40-Q61]

Share

Latest [Mar 09, 2023] 100% Passing Guarantee - Brilliant C_TS422_2021 Exam Questions PDF

C_TS422_2021 Certification – Valid Exam Dumps Questions Study Guide! (Updated 82 Questions)

NEW QUESTION 40
What are the possible results of a production planning run in Advanced Planning (PP/DS)?

  • A. Scheduling agreement schedule line
  • B. Stock transport order
  • C. Production order
  • D. Purchase requistion
  • E. Planned order

Answer: A,D,E

 

NEW QUESTION 41
What does forecasting in demand planning cycle include?

  • A. Past procurment quantities
  • B. Market intelligence
  • C. One-off events
  • D. Past quotation quantities
  • E. Past sales order quantites

Answer: B,C,E

 

NEW QUESTION 42
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the operation using finite scheduling in planning table
  • B. You can reschedule the operation using lead time scheduling in a planning table
  • C. You can reschedule the operation using midpoint scheduling in a planning table.
  • D. You can reschedule the order using infinite scheduling in a planing table

Answer: A,B

 

NEW QUESTION 43
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The plant-specific status
  • B. The most restrictive status
  • C. The cross-plant status
  • D. The last restrictive status

Answer: B

 

NEW QUESTION 44
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use a specific MRP type
  • B. Use a specific material group
  • C. Use specific MRP controller
  • D. Use a specific material status

Answer: B,C

 

NEW QUESTION 45
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

Answer: A

 

NEW QUESTION 46
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Replenishment strategy
  • B. Control cycle
  • C. Rate routing
  • D. Production supply area

Answer: B

 

NEW QUESTION 47
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
  • B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • D. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements

Answer: C

 

NEW QUESTION 48
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To stage different components for a production line simultaneously
  • B. To determine the work in progress along the production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To reduce the total production lead time for along production line

Answer: B,C

 

NEW QUESTION 49
Which of the following questions do you have to answer before you start creating a BOM?

  • A. What status does the BOM have?
  • B. In which storage location is the BOM required?
  • C. Is the material type allowed in the BOM?
  • D. Which Valid To information is necessary?

Answer: C,D

 

NEW QUESTION 50
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?

  • A. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
  • B. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
  • C. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
  • D. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator

Answer: D

 

NEW QUESTION 51
Which business processes are affected by setting in the order type-dependent parameters?

  • A. Implement engineering changes.
  • B. Select master data.
  • C. Intiate quality inspections.
  • D. Define integration to cost accounting.

Answer: B,D

 

NEW QUESTION 52
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using run schedule quantities for in-house production
  • B. Using stock transfer reservations for stock transfer
  • C. Using quotations for internal and external procurement
  • D. Using purchase orders for external procurement
  • E. Using purchasing costs for automated source prioritization

Answer: A,B,D

 

NEW QUESTION 53
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. By-products
  • B. Bulk materials
  • C. Continuous flow materials
  • D. Co-products
  • E. Waste products

Answer: A,C,D

 

NEW QUESTION 54
How can you limit the validity of a bill of material (BOM)?

  • A. By material type
  • B. By plant
  • C. By period
  • D. By industry

Answer: B,C

 

NEW QUESTION 55
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP SuccessFactors
  • B. SAP Hybris
  • C. SAP Ariba
  • D. SAP Fieldglass
  • E. SAP Concur

Answer: C,D,E

 

NEW QUESTION 56
What is the difference between co-products and by-products?

  • A. Only co-products can be manufactured in isolation from the main product.
  • B. Only co-products appear in the process or production order settlement rule.
  • C. Only by-products have a zero inventory valuation.
  • D. Only co-products are identified by a special item category in the bill of material (BOM).

Answer: B

 

NEW QUESTION 57
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning without final assembly (50)
  • B. Make-to-order production (20)
  • C. Planning at assembly level (70)
  • D. Planning with final assembly (40)

Answer: A

 

NEW QUESTION 58
Which information is required when you created a production master in SAP S/4HANA?

  • A. Industry sector
  • B. Base unit of measure
  • C. Selective screen for views
  • D. Product type

Answer: C,D

 

NEW QUESTION 59
How can you achive a feasible production plan in case of capacity constraints?

  • A. Adjust the available capacity.
  • B. Select an alternative mode on a resource.
  • C. Reduce the planning window
  • D. Execute an infinite production planning run
  • E. Form optimum sequence to reduce setup times

Answer: A,B,E

 

NEW QUESTION 60
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Work item
  • B. WBS item
  • C. Variable-size item
  • D. Non-stock item

Answer: C,D

 

NEW QUESTION 61
......

C_TS422_2021 are Available for Instant Access: https://gocertify.topexamcollection.com/C_TS422_2021-vce-collection.html