SAP C_TS422_2601 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C_TS422_2601 |
| Exam Format: | Multiple response, Multiple choice |
| Real Exam Qty: | 80 |
| Exam Price: | 550 USD |
| Available Languages: | English |
| Passing Score: | 68% |
| Exam Duration: | 180 minutes |
| Recommended Training: | SAP Learning Journeys |
| Exam Registration: | SAP Certification Portal |
| Sample Questions: | SAP C_TS422_2601 Sample Questions |
| Exam Way: | Online proctored exam via SAP certification platform |
| Pre Condition: | Recommended SAP training in SAP S/4HANA Production Planning and Manufacturing (TS422) or equivalent practical experience |
| Official Syllabus URL: | https://learning.sap.com/certifications |
SAP C_TS422_2601 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Material Requirements Planning (MRP) | - Net requirements calculation - MRP types and planning strategies - MRP runs and exception messages |
| Capacity Planning | - Work center scheduling - Capacity evaluation and leveling |
| Integration with Other SAP Modules | - Integration with Sales and Distribution (SD) - Integration with Quality Management (QM) - Integration with Materials Management (MM) |
| Demand Management and Planning | - Demand management strategies - Sales and Operations Planning (S&OP) |
| Overview of SAP S/4HANA Production Planning and Manufacturing | - Core manufacturing processes overview - System architecture and integration concepts |
| Master Data for Production Planning | - Work centers and routings - Bills of Material (BOM) - Material master and production-relevant views |
| Production Planning and Execution | - Goods issue and goods receipt processes - Order execution and confirmations - Planned orders and production orders |
SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon.
- B. Specify a negative planning horizon.
- C. Specify a negative offset time.
- D. Specify a negative opening period.
Correct Answer: C 🗳️
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
Note: There are 2 correct answers to this question.
- A. Changes are automatically implemented in the complete collective order.
- B. Scheduling of an operation takes place as close as possible to the desired date.
- C. Sequencing on multiactivity resources is automatically updated.
- D. Neighboring operations can be moved in both directions in order to create a slot.
Correct Answer: A,B 🗳️
You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.
- A. Top of Yellow
- B. Top of Red
- C. Top of Green
- D. Top of Red Base
Correct Answer: C 🗳️
What are the key features of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the use of subitems inside material BOM (bill of material)
- B. To determine the sequence in which materials are planned in MRP
- C. To determine how costs are rolled up by product costing
- D. To determine the priority of alternative components inside ATP
Correct Answer: B,C 🗳️
How can you support a GMP (Good Manufacturing Practice) compliant production process?
Note: There are 3 correct answers to this question.
- A. Digital signature
- B. GMPcompliant flag
- C. Approved resources
- D. Batch record
- E. Recipe approval
Correct Answer: A,D,E 🗳️