SAP C-TS422-2601 Exam Overview:
| Certification Vendor: | SAP |
| Exam Name: | SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C_TS422_2601 |
| Passing Score: | 68% |
| Exam Price: | 550 USD |
| Available Languages: | English |
| Exam Duration: | 180 minutes |
| Exam Format: | Multiple choice, Multiple response |
| Real Exam Qty: | 80 |
| Recommended Training: | SAP Learning Journeys |
| Exam Registration: | SAP Certification Portal |
| Sample Questions: | SAP C-TS422-2601 Sample Questions |
| Exam Way: | Online proctored exam via SAP certification platform |
| Pre Condition: | Recommended SAP training in SAP S/4HANA Production Planning and Manufacturing (TS422) or equivalent practical experience |
| Official Syllabus URL: | https://learning.sap.com/certifications |
SAP C-TS422-2601 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Capacity Planning | - Work center scheduling - Capacity evaluation and leveling |
| Production Planning and Execution | - Order execution and confirmations - Goods issue and goods receipt processes - Planned orders and production orders |
| Integration with Other SAP Modules | - Integration with Quality Management (QM) - Integration with Sales and Distribution (SD) - Integration with Materials Management (MM) |
| Material Requirements Planning (MRP) | - Net requirements calculation - MRP types and planning strategies - MRP runs and exception messages |
| Master Data for Production Planning | - Material master and production-relevant views - Work centers and routings - Bills of Material (BOM) |
| Overview of SAP S/4HANA Production Planning and Manufacturing | - Core manufacturing processes overview - System architecture and integration concepts |
| Demand Management and Planning | - Sales and Operations Planning (S&OP) - Demand management strategies |
SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
1. Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.
A) MRP area data
B) Production version data
C) Warehouse number data
D) Storage location data
2. What are the prerequisites for a reporting point confirmation in repetitive manufacturing?
Note: There are 2 correct answers to this question.
A) Defining the operations as reporting points using the control key
B) Defining the relevant work centers in the routing
C) Activating the reporting point backflush in the work centers
D) Activating the reporting point backflush in the order dependent parameters
3. What are the key features of using a low level code?
Note: There are 2 correct answers to this question.
A) To determine the use of subitems inside material BOM (bill of material)
B) To determine the sequence in which materials are planned in MRP
C) To determine how costs are rolled up by product costing
D) To determine the priority of alternative components inside ATP
4. What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
A) Status
B) Installation point
C) Scrap percentage
D) Quantity
5. Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
A) Only bottleneck operations
B) Operations assigned to a pacemaker work center
C) Sub-operations
D) All operations
Solutions:
| Question # 1 Answer: C,D | Question # 2 Answer: A,C | Question # 3 Answer: B,C | Question # 4 Answer: B,D | Question # 5 Answer: A,C |

We're so confident of our products that we provide no hassle product exchange.


By Prima


