SAP C_APO2_73 Exam Overview:
| Certification Vendor: | SAP |
| Exam Name: | Production Planning (PP-DS) and Global Available-to-Promise (Global ATP) in SAP Advanced Planning and Optimization 7.0 |
| Exam Number: | C_APO2_73 |
| Passing Score: | 64% |
| Exam Format: | Multiple choice, Multiple response |
| Certificate Validity Period: | Valid indefinitely unless SAP retires the certification |
| Related Certifications: | SAP Certified Application Associate - Planning and GATP in SAP SCM APO 7.0 EhP1 |
| Exam Price: | Approx. $500 USD (varies by region) |
| Available Languages: | English |
| Real Exam Qty: | 80 |
| Exam Duration: | 180 minutes |
| Recommended Training: | SAP SCM230 Global Available-to-Promise SAP SCM220 Production Planning & Detailed Scheduling |
| Exam Registration: | Pearson VUE SAP Certification Hub |
| Exam Way: | Online proctored via SAP Certification Hub or onsite at Pearson VUE authorized centers |
| Pre Condition: | Recommended: Basic knowledge of SAP SCM, APO, PP/DS, and Global ATP; hands-on experience |
| Official Syllabus URL: | https://training.sap.com/certification/c_apo2_73-sap-certified-application-associate-production-planning-pp-ds-and-global-available-to-promise-global-atp-in-sap-advanced-planning-and-optimization-7-0/ |
SAP C_APO2_73 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: APO Integration and Administration | 8%-12% | - Integration scenarios - Basic administration and monitoring |
| Topic 2: Core Interface (CIF) | 8%-12% | - Master data integration - Transactional data transfer - Monitoring and troubleshooting |
| Topic 3: Global ATP and Capable-to-Promise (CTP) Processes | >12% | - Basic ATP logic - Rules-based ATP - CTP and multi-level ATP |
| Topic 4: Master Data in APO | 8%-12% | - Product, resource, and location master - Production process model / iPPE - Integration with ECC master data |
| Topic 5: Application Overview and Background | 8%-12% | - SAP SCM APO architecture - Supply chain planning integration |
| Topic 6: Production Planning and Detailed Scheduling (PP/DS) Processes | >12% | - Planning results evaluation - Heuristics and scheduling algorithms - PP/DS planning functions |
| Topic 7: Configuration of PP/DS | >12% | - Model and version setup - Heuristics and strategy profiles - Scheduling parameters |
| Topic 8: Configuration of Global ATP | >12% | - Integration with sales and distribution - Rule-based ATP setup - Check instructions and scope of check |

We're so confident of our products that we provide no hassle product exchange.


By Curitis


