ISQI ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Sample Questions:
1. Which aspect in the test estimate is the main risk in this project? 1 credit
A) The costs of hardware and tools
B) Quality of the specification
C) Unknown input quality due to third party development
D) Availability of end-users
2. Which of the following would you expect to see in the master test plan? 1 credit
A) A description of how the test cases are cross-referenced to requirements in the test management tool.
B) A detailed identification of the resources that will carry out structural testing in the first iteration.
C) A list of the names of the testers who will carry out the performance testing for the final iteration.
D) The test approach that will be applied at system integration testing.
3. As a result of the RAD based development approach, the test manager has decided to change the risk mitigation approach. Which test technique might be most appropriate to use? 2 credits
A) Decision Table Testing
B) Boundary Value Analysis
C) Exploratory Testing
D) Error Guessing
4. A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.
i. External test specialists perform non-functional testing.
ii. Testing is outsourced.
iii. Testing is carried out by the developer.
iv.
A separate test team carries out the testing.
v.Testing is performed by the business.
vi. Testing is performed by a different developer.
Which of the following orders the above in a correct order of independence? 1 credit
A) ii, v, i, iii
B) ii, i, v, vi
C) i, iv, v, vi
D) i, ii, iv, vi
5. Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits
i. We do not have a clear understanding of the requirements from a customer perspective.
ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.
iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.
iv.
The company test strategy does not fit well within the V life cycle model.
A) (ii) and (iv)
B) (i) and (iv)
C) (i) and (ii)
D) (ii) and (iii)
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: D | Question # 3 Answer: C | Question # 4 Answer: B | Question # 5 Answer: C |