Oracle 1Z0-1066-20 Exam Overview:
| Certification Vendor: | Oracle |
|---|---|
| Exam Name: | Oracle Planning and Collaboration Cloud 2020 Implementation Essentials |
| Exam Number: | 1Z0-1066-20 |
| Available Languages: | English |
| Exam Duration: | 120 minutes |
| Related Certifications: | Oracle Planning and Collaboration Cloud 2020 Certified Implementation Specialist |
| Real Exam Qty: | 76 |
| Exam Format: | Multiple choice |
| Sample Questions: | Oracle 1Z0-1066-20 Sample Questions |
| Exam Way: | Online proctored and onsite computer-based testing available through Oracle |
| Pre Condition: | Experience with Oracle Planning and Collaboration Cloud implementations or equivalent knowledge recommended |
| Official Syllabus URL: | https://education.oracle.com/oracle-planning-and-collaboration-cloud-2025-implementation-professional/pexam_1Z0-1066-25 |
Oracle 1Z0-1066-20 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Supply Planning | - Configure and manage supply plans - Inventory and sourcing rules |
| Topic 2: Planning Central Feature Usage | - Simulation sets - Exceptions and dashboards |
| Topic 3: Data Collection and Analytics | - Planning analytics and reporting - Data collection setup |
| Topic 4: Demand Planning | - Configure and manage demand plans - Forecast generation and adjustment |
Oracle Planning and Collaboration Cloud 2020 Implementation Essentials Sample Questions:
As the planner, you have made some changes to a few of the specifications for items in your simulation sets.
You would like to run one of your existing Demand and Supply Plans that contains this simulation set to see how these changes impact the plan.
Which option shows the steps you must complete in order to ensure that when you run your existing Demand and Supply plan, it contains your changes to the simulation set?
- A. No additional steps are necessary. Any plans that contain your simulation set will automatically be updated with the changes.
- B. When the Demand and Supply Plan is run, verify that 'Recalculate Safety Stock' is selected in the Details section.
- C. You are only able to update one item attribute at a time. Since you have changed multiple attributes, you will be unable to update and run this plan.
- D. When the Demand and Supply Plan is run, verify that 'Refresh with current data' is selected in the Details section.
Correct Answer: D 🗳️
During a client implementation, it is determined that an external forecast will need to be imported into Planning Central for use as a Demand Schedule in a Supply Plan.
What three steps must be executed to enable the successful load of the External Forecast file? (Choose three.)
- A. Flat File must be zipped.
- B. Load Interface File for Import Process must be run.
- C. Collect Legacy Data Process must be run from Planning.
- D. CSV file must be generated.
- E. Collect Planning Data Process must be run from Planning.
Correct Answer: B,C,D 🗳️
When analyzing demand fulfillment, what are the three types of recommendations that users can review and accept for expediting? (Choose three.)
- A. Expedite make orders
- B. Expedite make to stock orders
- C. Expedite drop ship orders
- D. Expedite buy orders
- E. Expedite transfer orders
Correct Answer: A,D,E 🗳️
During an implementation, customer is in the process of planning supply requirements. Customer also needs to generate forecast and safety stock levels. Which plan type on the plan options should the customer be running?
- A. Integrated Plan
- B. Supply Plan
- C. Safety Stock and Forecast Plan
- D. Demand Plan
- E. Demand and Supply Plan
Correct Answer: E 🗳️
Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.
- A. Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
- B. Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.
- C. Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
- D. Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.
Correct Answer: B 🗳️

We're so confident of our products that we provide no hassle product exchange.


By Penelope


